The "Matrice des risques / Risks matrix" report represents your risks along the probability/impact axes in a matrix and displays the list of risks in a detailed table in the desired columns.
Use case example: This report can be used to visually monitor project risks.

The slide is divided into 3 zones, represented by the orange areas in the image above:



